Machine-downtime tracking is a fundamental, foundational, most basic component of any reliability-improvement effort. Yet in many plants, I’ve noticed that any form of machine-downtime tracking is the responsibility of the Maintenance Department. Contrary to their logic, Maintenance should NOT be the collector nor the repository of machine downtime data.

Here’s the rub when Maintenance collects and reports downtime: All machine downtime automatically becomes associated with maintenance. In short, it’s the “Maintenance Downtime Report.” This is especially true with an organization’s executive and senior management. Maintenance management is then often seen as making excuses or pointing fingers when reports show “operational” (non-maintenance) downtime.

Some businesses use work orders for tracking maintenance downtime. What downtime is recorded in work orders? It’s  the type of downtime that requires a maintenance intervention. Again, the Maintenance Department becomes associated with downtime.


THE CENTER OF ALL MACHINE DOWNTIME DATA

So, where should this downtime tracking begin? The center of all machine downtime is the MACHINE. Downtime tracking associated with the machine can then be captured in reason categories such as operational (production), product materials, product quality, setup/changeover, utilities, maintenance, and the like. Downtime categories then capture the reason, date, time, duration, and eventually the cause and corrective action at a minimum.


A REAL-WORLD CASE EXAMPLE

We were challenged by the Plant Manager and browbeaten Maintenance Manager to determine and correct the critical bottleneck machine-downtime dilemma that has been nagging them for months. The downtime was logged on a tracking sheet by the operators. This raw data was compiled and then reported by the Maintenance Manager during weekly staff meetings. So, he was the one who got the verbal smacks.

Production management calculated “downtime” by subtracting running time from total shift hours minus scheduled breaks and meals. They determined there was apparently too much downtime of an undetermined reason. Again, it became a maintenance problem.

Our solution was to install a machine data logging device on the main motor drive to detect the motor’s start, run, and shutdown times and durations. This data logger ran on all three shifts for a week, as did the typical operator downtime tacking sheets.

The data-logger report was downloaded after a week of production. The results were revealing. On some shifts, the machine was running 15 minutes after the start of shift, ran up to scheduled breaks, restarted, and ran until 15 minutes before the end of shift. That was perfect.

But the data-logger report also showed the culprits: Second and Third Shifts (with Third being the worst). In many cases, the machine was started an hour (or more) AFTER the start of shift, shut down BEFORE scheduled breaks and extended past the end of breaks. The end of Third shift was an exception in that the machine was running up to the end of shift.

Third Shift was staffed differently. Since this was a bottleneck machine, it was one of very few running on Third. There was only one supervisor for the whole plant on Third Shift. The operator was taking advantage of the lack of supervision and others in the plant. But why did the machine run so well at the end of the shift? Day Shift supervision showed up 30 minutes early to get their shift started.

The downtime-data-logging report had the granularity that the other tracking reports failed to communicate. Previously ALL downtime data was aggregated by the week’s total, not by day or shift.

It is our job, as RAM pros, to see that ALL the machine downtime on critical assets is captured with sufficient granularity to solve the problems, regardless of  reason and cause.TRR


 

ABOUT THE AUTHOR
Bob Williamson is a long-time contributor to the “people-side” of the world-class-maintenance and manufacturing body of knowledge across dozens of industry types. His vast background in maintenance, machine and tool design, and teaching has positioned his work with over 500 companies and plants, facilities, and equipment-oriented organizations. Contact him directly at 512-800-6031 or [email protected].


 